
I have placed an order for 100 of these boards to be built and assembled. The costs of this was well into four figures
They look almost identical to previous boards. I have tweaked they layout a lot to hopefully improve reliability of assembly. Last time I ordered some boards about 40% of them did not work and I had to repair them. Even so there was still a few boards which I was unable to repair. In any case, I should be able to get around 50 of these kits in my store again in a few weeks time.
