Page 5 of 9

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 10:18
by marpla
Hi.

Next one from PPA. Two more PCBs, please.

Greetings Marcin.

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 10:19
by wali7
If parcels to Poland are missing sometimes, why not to send one with bulk of 20-30 pieces by Fedex, or with other good reputation company, with good insurance paid? It would be finally cheaper&faster for us.
Please, consider this.

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 10:53
by terriblefire
wali7 wrote: 03 Jun 2020 10:19 If parcels to Poland are missing sometimes, why not to send one with bulk of 20-30 pieces by Fedex, or with other good reputation company, with good insurance paid? It would be finally cheaper&faster for us.
Please, consider this.
Guys, if you dont like how i do this please feel free not to order.

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 11:42
by wali7
Your product, your rules. I can only adjust to it.
So I hold my order (1 pcb).

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 11:57
by lopezpb
Of course, we accept your terms, so please add us to the list.

Thanks!

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 13:13
by Skofrant
Two PCB please. Bulk order from ppa.pl.

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 14:05
by Umberto1st
terriblefire wrote: 02 Jun 2020 20:41


Please point out mistakes or missing orders.
You missed me. I would love to get 3 unpopulated boards, Thank you much

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 14:14
by Umberto1st
Umberto1st wrote: 03 Jun 2020 14:05
terriblefire wrote: 02 Jun 2020 20:41


Please point out mistakes or missing orders.
You missed me. I would love to get 3 unpopulated boards, Thank you much
Just for curiosity what was the total time from first thought to working prototype in hours. Looks like your pumping these out faster than I can read about them

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 14:28
by terriblefire
Umberto1st wrote: 03 Jun 2020 14:14 Just for curiosity what was the total time from first thought to working prototype in hours. Looks like your pumping these out faster than I can read about them
These are partially assembled from China. They are not completely populated.

In terms of my output ...probably the time breakdown.

1. Initial schematic design - 10-30 hrs
2. Routing - 50-100 hrs
3. 1st Build soldering time - 2-3hrs
4. Firmware development - 50-500hrs (tf536 was lower because it was a merge of tf330 + tf534)

I can control everything in my lab remotely so i can sit and do dev watching TV.

Batch is closed and ordered. I've cut it short at 87 because JLC often email me and say that 1 or 2 didnt pass QC from the factory.

Re: TF536 Bulk Order (Batch 2 Open)

Posted: 03 Jun 2020 15:21
by Umberto1st
terriblefire wrote: 03 Jun 2020 14:28
Umberto1st wrote: 03 Jun 2020 14:14 Just for curiosity what was the total time from first thought to working prototype in hours. Looks like your pumping these out faster than I can read about them
These are partially assembled from China. They are not completely populated.

Quick question's, if they partially assembled, how does that effect the BOM listed in the batch 1 thread. Is the Xilinx chip pre-soldered. Also how does buffered and unbuffered ram affect the operation in terms of games and such? I envy you, I should have learned to code back in the 8bit days, the CPLD stuff has left me behind

Your time is appreciated and hope you can get back adequate compensation for your efforts

Rob