Re: A BBC B is coming, but it has a tinge of sadness
Posted: 28 Jul 2022 23:22
Well, I finally got to unpacking and a bit of cleaning. Overall everything is in fabulous order and was clearly well looked after. Here's the money shot:
So, we have:
A BBC Model B, Issue 7 mainboard and InterWord ROM based word processor and RGB cable, most likely for a Microvitec Cub.
Cumana double 5 1/4" floppy disk unit with manual and disk.
Heavy duty steel monitor stand.
Acorn cassette unit with manual, cables and 5x cassettes including Chuckie Egg :)
User manual and introductory software pack on cassette.
InterWord packaging and manual.
Software disk (Contents unknown)
Citizen 120D dot matrix printer with all cables tractor feed and a pile of tractor feed paper!!
A Gunshot joystick specifically for the BBC as it comes with an adapter.
I've given it all a basic clean up and it's all come up very nicely indeed and was clearly looked after by the previous owner.
Next on the cards is to get the RIFAs replaced in the PSU. Last time I had RIFAs go off (The ICL OPD), it took a good month to get the smell out of the office/workshop, so they're getting replaced before they have the chance to fail!!
I'll also pull the top off the Cumana unit and clean the mechanism and heads before I give it a go.
The only bad bit is the 'ashtray' to the left of the keyboard which has been pushed through, though I might see if I can get a period correct ZIF socket to fit there.
So, we have:
A BBC Model B, Issue 7 mainboard and InterWord ROM based word processor and RGB cable, most likely for a Microvitec Cub.
Cumana double 5 1/4" floppy disk unit with manual and disk.
Heavy duty steel monitor stand.
Acorn cassette unit with manual, cables and 5x cassettes including Chuckie Egg :)
User manual and introductory software pack on cassette.
InterWord packaging and manual.
Software disk (Contents unknown)
Citizen 120D dot matrix printer with all cables tractor feed and a pile of tractor feed paper!!
A Gunshot joystick specifically for the BBC as it comes with an adapter.
I've given it all a basic clean up and it's all come up very nicely indeed and was clearly looked after by the previous owner.
Next on the cards is to get the RIFAs replaced in the PSU. Last time I had RIFAs go off (The ICL OPD), it took a good month to get the smell out of the office/workshop, so they're getting replaced before they have the chance to fail!!
I'll also pull the top off the Cumana unit and clean the mechanism and heads before I give it a go.
The only bad bit is the 'ashtray' to the left of the keyboard which has been pushed through, though I might see if I can get a period correct ZIF socket to fit there.