Hi.
Next one from PPA. Two more PCBs, please.
Greetings Marcin.
TF536 Bulk Order (Batch 2 Shipped)
Moderators: terriblefire, Terriblefire Moderator
-
wali7
- Posts: 3
- Joined: 03 Jun 2020 09:40
Re: TF536 Bulk Order (Batch 2 Open)
If parcels to Poland are missing sometimes, why not to send one with bulk of 20-30 pieces by Fedex, or with other good reputation company, with good insurance paid? It would be finally cheaper&faster for us.
Please, consider this.
Please, consider this.
-
terriblefire
- Admin sponsor

- Posts: 5687
- Joined: 28 Aug 2017 22:56
- Location: Glasgow, UK
Re: TF536 Bulk Order (Batch 2 Open)
Guys, if you dont like how i do this please feel free not to order.wali7 wrote: 03 Jun 2020 10:19 If parcels to Poland are missing sometimes, why not to send one with bulk of 20-30 pieces by Fedex, or with other good reputation company, with good insurance paid? It would be finally cheaper&faster for us.
Please, consider this.
———
"It is not necessarily a supply voltage at no load, but the amount of current it can provide when touched that
indicates how much hurting you shall receive."
"It is not necessarily a supply voltage at no load, but the amount of current it can provide when touched that
indicates how much hurting you shall receive."
-
wali7
- Posts: 3
- Joined: 03 Jun 2020 09:40
Re: TF536 Bulk Order (Batch 2 Open)
Your product, your rules. I can only adjust to it.
So I hold my order (1 pcb).
So I hold my order (1 pcb).
-
lopezpb
- Posts: 11
- Joined: 03 Jun 2020 09:22
Re: TF536 Bulk Order (Batch 2 Open)
Of course, we accept your terms, so please add us to the list.
Thanks!
Thanks!
-
Skofrant
- Posts: 1
- Joined: 03 May 2020 07:31
Re: TF536 Bulk Order (Batch 2 Open)
Two PCB please. Bulk order from ppa.pl.
-
Umberto1st
- Posts: 105
- Joined: 27 Sep 2017 18:27
Re: TF536 Bulk Order (Batch 2 Open)
You missed me. I would love to get 3 unpopulated boards, Thank you much
3)1040 stf/m, 2)Mega 4 ST, 1)STE, 1)Mega STE, 1)STacy, 2)Falcon 030
-
Umberto1st
- Posts: 105
- Joined: 27 Sep 2017 18:27
Re: TF536 Bulk Order (Batch 2 Open)
Just for curiosity what was the total time from first thought to working prototype in hours. Looks like your pumping these out faster than I can read about themUmberto1st wrote: 03 Jun 2020 14:05You missed me. I would love to get 3 unpopulated boards, Thank you much
3)1040 stf/m, 2)Mega 4 ST, 1)STE, 1)Mega STE, 1)STacy, 2)Falcon 030
-
terriblefire
- Admin sponsor

- Posts: 5687
- Joined: 28 Aug 2017 22:56
- Location: Glasgow, UK
Re: TF536 Bulk Order (Batch 2 Open)
These are partially assembled from China. They are not completely populated.Umberto1st wrote: 03 Jun 2020 14:14 Just for curiosity what was the total time from first thought to working prototype in hours. Looks like your pumping these out faster than I can read about them
In terms of my output ...probably the time breakdown.
1. Initial schematic design - 10-30 hrs
2. Routing - 50-100 hrs
3. 1st Build soldering time - 2-3hrs
4. Firmware development - 50-500hrs (tf536 was lower because it was a merge of tf330 + tf534)
I can control everything in my lab remotely so i can sit and do dev watching TV.
Batch is closed and ordered. I've cut it short at 87 because JLC often email me and say that 1 or 2 didnt pass QC from the factory.
———
"It is not necessarily a supply voltage at no load, but the amount of current it can provide when touched that
indicates how much hurting you shall receive."
"It is not necessarily a supply voltage at no load, but the amount of current it can provide when touched that
indicates how much hurting you shall receive."
-
Umberto1st
- Posts: 105
- Joined: 27 Sep 2017 18:27
Re: TF536 Bulk Order (Batch 2 Open)
Quick question's, if they partially assembled, how does that effect the BOM listed in the batch 1 thread. Is the Xilinx chip pre-soldered. Also how does buffered and unbuffered ram affect the operation in terms of games and such? I envy you, I should have learned to code back in the 8bit days, the CPLD stuff has left me behindterriblefire wrote: 03 Jun 2020 14:28These are partially assembled from China. They are not completely populated.Umberto1st wrote: 03 Jun 2020 14:14 Just for curiosity what was the total time from first thought to working prototype in hours. Looks like your pumping these out faster than I can read about them
Your time is appreciated and hope you can get back adequate compensation for your efforts
Rob
3)1040 stf/m, 2)Mega 4 ST, 1)STE, 1)Mega STE, 1)STacy, 2)Falcon 030
Who is online
Users browsing this forum: ClaudeBot and 1 guest